Rough Framing Quality Control Checklist Please review this list and check mark each item to confirm completion. Mark N/A (not applicable) if it was not part of your specs or was not needed for this project. Jobsite and/or Address* Company* Check that the walls are located per the plans ✔︎ N/A Check framing requirements of plumber to allow for layout of joists and studs to minimize cutting and call-backs ✔︎ N/A Check framing requirements of plumber to allow for layout of joists and studs to minimize cutting and call-backs ✔︎ N/A Reframe any plumbing cutouts as necessary ✔︎ N/A Check walls for straightness, plumb, & square; correct size lumber for studs and headers ✔︎ N/A Check window and door openings; dimensions, plumb, square ✔︎ N/A Check all warped studs removed or straightened ✔︎ N/A Check garage door jamb & trim mold installed properly ✔︎ N/A Check trusses erected according to engineered design and installation instructions ✔︎ N/A Check for proper clearance around chimney ✔︎ N/A Check framing for moisture content; beware of excessively moist conditions which will contribute to high humidity in house during drying ✔︎ N/A Check studs for irregularities in wall line; make partial cuts in studs to straighten wall line ✔︎ N/A Check backing in walls and ceiling for nailing ✔︎ N/A Check rough openings for square, plumb, level, size ✔︎ N/A Confirm walls are straight behind countertops ✔︎ N/A Check windows installed per manufacturers installation instructions ✔︎ N/A Windows checklist 1.) Window frame secure against building 2.) Gap around window frame consistent on all sides 3.) Windows open and close smoothly 4.) Reveal at open window to be consistent 5.) Check that jamb is same dimension at top, middle and bottom 6.) Check that there are no scratches on glass I confirm that all checklist items listed have been reviewed prior to submitting this form.* Yes No (please describe in notes) Notes and any additional information you would like to submit:Name* First Last Date*